CR 342 (14400) over Mulberry Creek

1.2 Mi W of FM 196 · County 277, Texas · Built 1990 · 1 Lanes · 40 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
011390AA0342002
Year Built
1990
Length
7.6 m (24.9 ft)
Max Span
3 m
Width
5.3 m (17.4 ft)
Lanes
1
Daily Traffic
40
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.