FM 195 over SIX MILE CREEK RELIEF

3.8 MI NE OF US 82 · County 277, Texas · Built 1954 · 2 Lanes · 4,518 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
011390073002014
Year Built
1954
Reconstructed
1978
Length
30.5 m (100.1 ft)
Max Span
7.6 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
4,518
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$88,000
Total Project Cost
$110,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.