CR 1048 over Branch of South Sulphur

3.2 Mi North of Celeste · County 231, Texas · Built 1999 · 2 Lanes · 10 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
011170AA0130001
Year Built
1999
Length
12.2 m (40 ft)
Max Span
12 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
10
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$28,000
Total Project Cost
$35,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.