BUS 67 (SPUR 302) over SABINE RIVER

.55 MI W OF JCT FM499 · County 231, Texas · Built 2000 · 2 Lanes · 4,840 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
011170000907425
Year Built
2000
Length
107.9 m (354 ft)
Max Span
18 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
4,840
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.