FM 1567 over BIRCH CREEK RELIEF

1.50 MI W OF SH 154 · County 223, Texas · Built 1996 · 2 Lanes · 536 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 7 Good

Location

32.990706, -95.621356

This bridge is in worse condition than 34.8% of bridges in County 223. The average bridge in Texas is 0 years old; this one is 30 years old.

Nearby Bridges

Bridge Details

Structure #
011130064104024
Year Built
1996
Length
18.3 m (60 ft)
Max Span
18.3 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
536
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.