IH 30 EB over ROCK CREEK RELIEF #2

5.60 MI E OF SH 19 · County 223, Texas · Built 1960 · 2 Lanes · 18,003 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
011130001002117
Year Built
1960
Length
55.5 m (182.1 ft)
Max Span
9.1 m
Width
12.1 m (39.7 ft)
Lanes
2
Daily Traffic
18,003
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.