S TRAVIS STREET over POST OAK CREEK

0.53 MI NE OF US 75 · County 181, Texas · Built 2023 · 1 Lanes · 1,435 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

33.609017, -96.605089

This bridge is in worse condition than 18.9% of bridges in County 181. The average bridge in Texas is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
010920C04321002
Year Built
2023
Length
76.2 m (250 ft)
Max Span
25.9 m
Width
18.3 m (60 ft)
Lanes
1
Daily Traffic
1,435
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.