TAYLOR ST over POST OAK CREEK

0.35 MI E OF GRANT ST · County 181, Texas · Built 1964 · 2 Lanes · 4,787 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
010920C04180001
Year Built
1964
Length
27.4 m (89.9 ft)
Max Span
9.1 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
4,787
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$51,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.