ROLAND RD over N BR BIG MINERAL CRK
1.0 MI N OF BONES CHAPEL · County 181, Texas · Built 1983 · 1 Lanes · 262 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
33.699272, -96.930794
This bridge is in worse condition than 89.4% of bridges in County 181. The average bridge in Texas is 0 years old; this one is 43 years old.
Nearby Bridges
CR 465/SIGN CR 165 over DRAW
Built 2012
US 377 over N FORK BIG MINERAL CREEK
Built 1962
ROLAND RD over S BR OF BIG MINERAL CK
Built 2023
US 377 over S FORK BIG MINERAL CREEK
Built 1962
ANDERSON RD over TRIB OF BIG MINERAL CRK
Built 1983
Shawnee Trail over Trib of Big Mineral Ck
Built 2012
ANDERSON ROAD over TRIB OF BIG MINERAL CRK
Built 1983
US 82 EB over US 377
Built 1970
US 82 WB over US 377
Built 1970
US 82 over DRAIN
Built 1970
Bridge Details
- Structure #
- 010920AA0414002
- Year Built
- 1983
- Length
- 18.3 m (60 ft)
- Max Span
- 12.2 m
- Width
- 6.1 m (20 ft)
- Lanes
- 1
- Daily Traffic
- 262
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,000
- Total Project Cost
- $3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.