PEARCE RD over DRAW

0.90 MI S OF HOLLINGSH RD · County 181, Texas · Built 1982 · 2 Lanes · 110 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
010920AA0399002
Year Built
1982
Length
7 m (23 ft)
Max Span
6.7 m
Width
6 m (19.7 ft)
Lanes
2
Daily Traffic
110
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.