SCOGGINS RD over BUCK CREEK
0.70 MI S OF FM 121 · County 181, Texas · Built 1995 · 2 Lanes · 316 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.448033, -96.840133
This bridge is in worse condition than 49.4% of bridges in County 181. The average bridge in Texas is 0 years old; this one is 31 years old.
Nearby Bridges
SCOGGINS RD over BEAR CREEK
Built 1982
FM 121 over DRAW
Built 1954
CALK RD over BEAR CREEK
Built 1982
FM 121 over Buck Creek
Built 2012
HOWELL RD over BUCK CREEK
Built 1985
MARTIN RD over DRAW
Built 1995
BUCK CREEK DR over DRAW
Built 1985
GORRELL RD over MUSTANG CREEK
Built 2016
HUNTER RD over RANGE CREEK
Built 2012
MCDONALD RD over BUCK CREEK
Built 1981
Bridge Details
- Structure #
- 010920AA0356002
- Year Built
- 1995
- Length
- 18.3 m (60 ft)
- Max Span
- 9.4 m
- Width
- 6 m (19.7 ft)
- Lanes
- 2
- Daily Traffic
- 316
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $60,000
- Total Project Cost
- $75,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.