CRAWFORD ROAD over TRIB OF BIG MINERAL ARM
0.3 MI E of FM 901 · County 181, Texas · Built 2023 · 2 Lanes · 40 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.727319, -96.845867
This bridge is in worse condition than 18.9% of bridges in County 181. The average bridge in Texas is 0 years old; this one is 3 years old.
Nearby Bridges
FM 901 over DRAW
Built 1956
FM 901 over SANDY CREEK
Built 2002
OLD SADLER RD over SANDY CREEK
Built 1999
OLD SADLER RD over DRAW
Built 2001
CORDELL RD over TRIB OF BIG MINERAL ARM
Built 1955
FM 901 over MINERAL CREEK
Built 1956
CORDELL RD over BIG MINERAL CREEK
Built 1955
SCARBROUGH RD over SANDY CREEK
Built 1990
RILEY RD over BIG MINERAL CREEK
Built 1995
BILL HOLDER RD over TRIB OF BRUSHY CREEK
Built 1997
Bridge Details
- Structure #
- 010920AA0306001
- Year Built
- 2023
- Length
- 15.2 m (49.9 ft)
- Max Span
- 15.2 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 40
- Material
- Prestressed Concrete
- Design
- Other
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.