CR 2105 over ROBERTS SPRING BRANCH

2.4 MI E OF JCT FM 2554 · County 147, Texas · Built 1980 · 1 Lanes · 40 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
010750AA0389002
Year Built
1980
Reconstructed
2007
Length
10.1 m (33.1 ft)
Max Span
9.4 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
40
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.