US 82 over SPRING BRANCH

8.4 MI E OF SH 78 · County 147, Texas · Built 1990 · 2 Lanes · 8,939 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
010750004521165
Year Built
1990
Reconstructed
2020
Length
8.1 m (26.6 ft)
Max Span
2.7 m
Width
57 m (187 ft)
Lanes
2
Daily Traffic
8,939
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.