GHOST CORPS TRAIL over TRIB TO PINEY FORK CREEK

0.4 MI E PALMYRA RD/GHOST · County 125, Tennessee · Built 2012 · 2 Lanes · 300 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
DAPFORCAT000013
Year Built
2012
Length
12.7 m (41.7 ft)
Max Span
11.7 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
300
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Other
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.