ROAD 1926W over HOLSTON RIVER

ENTRANCE TO AMMO STORAGE · County 073, Tennessee · Built 1990 · 2 Lanes · 50 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
DAPAMCHOL000020
Year Built
1990
Length
549.5 m (1802.8 ft)
Max Span
27.4 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
50
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
Other
Last Inspected
N/A
Est. Improvement
$113,000
Total Project Cost
$133,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.