SECOND STREET over HYPERBALLISTICS RANGE

596 FEET SOUTH OF VON KAR · County 051, Tennessee · Built 1960 · 2 Lanes · 50 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
AFTNANZY00003
Year Built
1960
Length
10.8 m (35.4 ft)
Max Span
6.1 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
50
Material
Concrete
Design
Frame (except frame culverts)
Owner
Other
Last Inspected
N/A
Est. Improvement
$12,000
Total Project Cost
$15,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.