FAP 96 over SMITH FORK CREEK

1.9 M NE JCT SR96&SR267 · County 189, Tennessee · Built 1956 · 2 Lanes · 3,365 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
95SR0960005
Year Built
1956
Reconstructed
1994
Length
71.6 m (234.9 ft)
Max Span
27.4 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
3,365
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$299,000
Total Project Cost
$449,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.