FAP 26 over SPRING CREEK

3.1 M SE JCT I40&SR26 · County 189, Tennessee · Built 1940 · 2 Lanes · 10,633 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
95SR0260003
Year Built
1940
Reconstructed
1983
Length
52.4 m (171.9 ft)
Max Span
13.1 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
10,633
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.