FAP 10 over WALKER BRANCH

1.6 M N JCT SR10&SR24 · County 189, Tennessee · Built 1955 · 2 Lanes · 10,246 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
95SR0100013
Year Built
1955
Length
10.1 m (33.1 ft)
Max Span
4.6 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
10,246
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$96,000
Total Project Cost
$145,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.