I40 over I40 / SR 26

EXIT-239 B · County 189, Tennessee · Built 1964 · 3 Lanes · 57,395 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
95I00400035
Year Built
1964
Reconstructed
1990
Length
61 m (200.1 ft)
Max Span
18 m
Width
17.7 m (58.1 ft)
Lanes
3
Daily Traffic
57,395
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,587,000
Total Project Cost
$2,381,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.