I840 over I840/ S GARRISON BRANC

4 MI S SR46 · County 187, Tennessee · Built 2012 · 2 Lanes · 22,556 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
94SR8400106
Year Built
2012
Length
256.2 m (840.6 ft)
Max Span
44.2 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
22,556
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,859,000
Total Project Cost
$8,789,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.