FAS 118 over OVERFLOW

.1 MI.N.OF LATHAM · County 183, Tennessee · Built 1954 · 2 Lanes · 727 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 6 Satisfactory
Substructure 5 Fair

Location

36.431392, -88.714639

This bridge is in worse condition than 91.2% of bridges in County 183. The average bridge in Tennessee is 0 years old; this one is 72 years old.

Nearby Bridges

Bridge Details

Structure #
92SR1180013
Year Built
1954
Length
52.1 m (170.9 ft)
Max Span
8.7 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
727
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$43,000
Total Project Cost
$65,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.