FAP 22 over COLEY BRANCH

3 MILES N.W.OF GLEASON · County 183, Tennessee · Built 1999 · 4 Lanes · 6,181 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
92SR0220011
Year Built
1999
Length
91.9 m (301.5 ft)
Max Span
18.5 m
Width
24.4 m (80.1 ft)
Lanes
4
Daily Traffic
6,181
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.