FAP 1 over DOG BRANCH

W.OF MCMINVILLE · County 177, Tennessee · Built 2015 · 2 Lanes · 7,457 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
89SR0010023
Year Built
2015
Length
44.7 m (146.7 ft)
Max Span
44.7 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
7,457
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.