FAS 287 over BARREN FORK RIVER

3 MI.S.OF CENTERTOWN · County 177, Tennessee · Built 1959 · 2 Lanes · 1,814 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
89S42570003
Year Built
1959
Length
120.4 m (395 ft)
Max Span
16.1 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
1,814
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$686,000
Total Project Cost
$1,030,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.