I26 over OVERFLOW

2.4 MI. S.W. OF · County 171, Tennessee · Built 1977 · 5 Lanes · 8,283 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
86I00260037
Year Built
1977
Length
15.1 m (49.5 ft)
Max Span
4.9 m
Width
515 m (1689.6 ft)
Lanes
5
Daily Traffic
8,283
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$567,000
Total Project Cost
$851,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.