FAP 1 over OVERFLOW

845 MI.NE.OF MACON · County 167, Tennessee · Built 1926 · 2 Lanes · 1,727 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
84SR0010007
Year Built
1926
Reconstructed
1993
Length
17.4 m (57.1 ft)
Max Span
8.7 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
1,727
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$307,000
Total Project Cost
$461,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.