NFA A555 over BRANCH

0.1 MI E OF ARK · County 167, Tennessee · Built 1976 · 2 Lanes · 50 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
840A5550001
Year Built
1976
Length
70 m (229.7 ft)
Max Span
23.3 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
50
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$930,000
Total Project Cost
$1,396,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.