FAU 5366 343792U over CSX RAILROAD

.2 M W JCT SR174/A.G. AVE · County 165, Tennessee · Built 2022 · 5 Lanes · 10,649 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
83SR1090003
Year Built
2022
Length
46.5 m (152.6 ft)
Max Span
25.1 m
Width
26.2 m (86 ft)
Lanes
5
Daily Traffic
10,649
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,220,000
Total Project Cost
$1,831,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.