FAP 109 over DONOHO BRANCH

IN PORTLAND · County 165, Tennessee · Built 1941 · 4 Lanes · 18,956 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
83SR0520027
Year Built
1941
Length
7.9 m (25.9 ft)
Max Span
3 m
Lanes
4
Daily Traffic
18,956
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$239,000
Total Project Cost
$359,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.