NFA 2061 over RED RIVER

3.5 MI W JCT SR76&SR109 · County 165, Tennessee · Built 1960 · 2 Lanes · 910 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 5 Fair
Substructure 7 Good

Location

36.556633, -86.570717

This bridge is in worse condition than 93% of bridges in County 165. The average bridge in Tennessee is 0 years old; this one is 66 years old.

Nearby Bridges

Bridge Details

Structure #
83020610001
Year Built
1960
Length
26.2 m (86 ft)
Max Span
8.8 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
910
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$135,000
Total Project Cost
$203,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.