FAP 34 over NFA 1378 RAMP

1 MI.SW. OF BRISTOL · County 163, Tennessee · Built 1963 · 2 Lanes · 16,362 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
82SR0340013
Year Built
1963
Length
55.8 m (183.1 ft)
Max Span
21.8 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
16,362
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$500,000
Total Project Cost
$751,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.