FAU 3899 over BR OF REEDY CREEK

FT ROBINSON DR-KINGSPORT · County 163, Tennessee · Built 1938 · 2 Lanes · 3,100 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
820A0700001
Year Built
1938
Reconstructed
1990
Length
49.6 m (162.7 ft)
Max Span
7.8 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
3,100
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,484,000
Total Project Cost
$2,227,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.