NFA 834 (SA 8109) over CUB CREEK

3MI.NO.OF SR76;NO.OFATKIN · County 161, Tennessee · Built 1958 · 2 Lanes · 575 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
81S62670003
Year Built
1958
Length
10.1 m (33.1 ft)
Max Span
4.6 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
575
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$94,000
Total Project Cost
$142,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.