FAP 1 over DRAINAGE DITCH

1.1 M E OF SR177 · County 157, Tennessee · Built 1929 · 4 Lanes · 14,728 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
79SR0010019
Year Built
1929
Length
11.6 m (38.1 ft)
Max Span
3.4 m
Width
19.7 m (64.6 ft)
Lanes
4
Daily Traffic
14,728
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$339,000
Total Project Cost
$509,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.