FAP 1 over WOLF RIVER

0.2 MI W OF I-40 JCT · County 157, Tennessee · Built 1926 · 4 Lanes · 36,466 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
79SR0010015
Year Built
1926
Reconstructed
1978
Length
218.5 m (716.9 ft)
Max Span
21.8 m
Width
20.1 m (65.9 ft)
Lanes
4
Daily Traffic
36,466
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,273,000
Total Project Cost
$9,410,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.