FAU 2803 over I-240 & I-40 RAMPS
MEMPHIS - POPLAR AVE · County 157, Tennessee · Built 1965 · 6 Lanes · 30,230 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
35.144664, -90.022025
This bridge is in worse condition than 94% of bridges in County 157. The average bridge in Tennessee is 0 years old; this one is 61 years old.
Nearby Bridges
FAU 2855 over JEFFERSON AVE / I-240
Built 1964
I40 over I-240 WB RP / I40 & I240
Built 2006
FAU 2850 over I-240 & MADISON AVE
Built 1971
I40-EB-RP TO I240 over I40-RP-K / I240-RL-EX-RP
Built 1966
I240 EB over I-240 EB / I-40
Built 2006
FAU 2850 over MADISON AVE RP K / I-240
Built 1969
I240 RP E over I-240 EX RAMP / I-240
Built 1964
I-240 EB 348578G over PEDESTRIAN FACILITY
Built 1962
FAP 3 over I240 & RAMPS
Built 1969
I40 over I-40 E.B. / AYERS ST.
Built 1966
Bridge Details
- Structure #
- 79I00400155
- Year Built
- 1965
- Length
- 75 m (246.1 ft)
- Max Span
- 21.1 m
- Width
- 26.7 m (87.6 ft)
- Lanes
- 6
- Daily Traffic
- 30,230
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,007,000
- Total Project Cost
- $7,511,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.