FAU 2819 over N. MCLEAN BLVD. / I-40
N. MCLEAN BLVD - MEMPHIS · County 157, Tennessee · Built 1975 · 4 Lanes · 7,363 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
35.192361, -89.993247
This bridge is in worse condition than 78.4% of bridges in County 157. The average bridge in Tennessee is 0 years old; this one is 51 years old.
Nearby Bridges
FAU 2819 over WOLF RIVER
Built 1980
I40-LL over I-40 W.B. / N WATKINS ST
Built 1979
I40-RL over I-40 E.B. / N WATKINS ST
Built 1979
FAU 2806 over WOLF RIVER
Built 1965
I40-LL over I-40 WB / N HOLLYWOOD ST
Built 1975
I40-RL over I-40 EB / N HOLLYWOOD ST
Built 1975
I40 over BRANCH
Built 1976
FAU 2821 over WOLF RIVER
Built 1965
FAP 300 EXIT RP over I-40 E.B.
Built 1977
FAP 300 RP TOI40EB over I-40 W.B.
Built 1977
Bridge Details
- Structure #
- 79I00400071
- Year Built
- 1975
- Length
- 86 m (282.2 ft)
- Max Span
- 43 m
- Width
- 21.3 m (69.9 ft)
- Lanes
- 4
- Daily Traffic
- 7,363
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $441,000
- Total Project Cost
- $662,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.