FAP 23 over SR 23 / SR 277

1.9 M S OF SR14 · County 157, Tennessee · Built 1964 · 8 Lanes · 25,485 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
79FA3120007
Year Built
1964
Length
30.5 m (100.1 ft)
Max Span
19.1 m
Width
30.8 m (101 ft)
Lanes
8
Daily Traffic
25,485
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$571,000
Total Project Cost
$857,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.