FAU 5161 over DRAINAGE DITCH

FARMINGTON-GERMANTOWN · County 157, Tennessee · Built 1993 · 4 Lanes · 16,531 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
790X0170001
Year Built
1993
Length
13.1 m (43 ft)
Max Span
3.7 m
Lanes
4
Daily Traffic
16,531
Material
Concrete Continuous
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$436,000
Total Project Cost
$655,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.