NFA N021 over BRANCH
DAKAR DRIVE · County 157, Tennessee · Built 2008 · 2 Lanes · 250 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
35.3436, -89.8826
This bridge is in worse condition than 39.4% of bridges in County 157. The average bridge in Tennessee is 0 years old; this one is 18 years old.
Nearby Bridges
NFA N007 over BRANCH & CNIC RAILROAD
Built 2013
NFA N007 over BRANCH
Built 2008
FAS 205 over NORTH FORK CREEK
Built 2001
NFA N007 over NORTH FORK CREEK
Built 2013
HUTCHINS ROAD over DRAINAGE CANAL
Built 1947
FAU 803 (SA 7916) over BIG CREEK CANAL
Built 2022
SAVITZ DRIVE over DRAINAGE CANAL
Built 1947
SINGLETON AVE over DRAINAGE CANAL
Built 1947
NFA N007 over NORTH FORK CREEK
Built 2013
FAU 385 over RALEIGH-MILLINGTON RD
Built 1980
Bridge Details
- Structure #
- 790N0210001
- Year Built
- 2008
- Length
- 7.8 m (25.6 ft)
- Max Span
- 7.8 m
- Width
- 7.5 m (24.6 ft)
- Lanes
- 2
- Daily Traffic
- 250
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.