NFA M340 over CHANNEL 3 DR / RIVERSIDE

CHANNEL 3 DR-MEMPHIS · County 157, Tennessee · Built 1948 · 2 Lanes · 480 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
790B5900001
Year Built
1948
Length
26.8 m (87.9 ft)
Max Span
13.4 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
480
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$438,000
Total Project Cost
$658,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.