FAP 66 over FRENCH BROAD RIVER

1.6 MI S JCT SR139 · County 155, Tennessee · Built 1968 · 2 Lanes · 44,996 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
5
Fair

Bridge Details

Structure #
78SR0660003
Year Built
1968
Reconstructed
1988
Length
235.3 m (772 ft)
Max Span
58.5 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
44,996
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,635,000
Total Project Cost
$8,453,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.