I 840 over DRAINAGE DITCH

I 840 · County 149, Tennessee · Built 1998 · 4 Lanes · 48,128 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
75SR8400065
Year Built
1998
Length
6.1 m (20 ft)
Max Span
3.1 m
Lanes
4
Daily Traffic
48,128
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$218,000
Total Project Cost
$328,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.