FAU 3381 over STEWART CREEK

ENON SPRINGS NEAR MAYFIEL · County 149, Tennessee · Built 1970 · 4 Lanes · 11,269 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
75M33810001
Year Built
1970
Reconstructed
1990
Length
27.4 m (89.9 ft)
Max Span
13.7 m
Width
15.9 m (52.2 ft)
Lanes
4
Daily Traffic
11,269
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$236,000
Total Project Cost
$355,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.