I24 over SR102 & OLIVE BRANCH

3.6 M SE JCT I24&SR266 · County 149, Tennessee · Built 1969 · 3 Lanes · 128,347 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
75I00240010
Year Built
1969
Length
59.4 m (194.9 ft)
Max Span
29.3 m
Width
22.6 m (74.1 ft)
Lanes
3
Daily Traffic
128,347
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.