FAS 269 over W. FORK STONES RIVER

1.9 MI W JCT SR10&SR269 · County 149, Tennessee · Built 1985 · 2 Lanes · 1,568 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
75E00270003
Year Built
1985
Length
56.1 m (184.1 ft)
Max Span
18.9 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
1,568
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$979,000
Total Project Cost
$1,469,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.