I65 over GUTHRIE RD

1.3 M N JCT SR75&I65 · County 147, Tennessee · Built 2023 · 3 Lanes · 53,633 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

36.5466, -86.634611

This bridge is in worse condition than 51.5% of bridges in County 147. The average bridge in Tennessee is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
74I00650023
Year Built
2023
Length
27.4 m (89.9 ft)
Max Span
26.2 m
Width
19.6 m (64.3 ft)
Lanes
3
Daily Traffic
53,633
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.