FAP 61 over CANEY CREEK

.6 M NE JCT SR61&SR382 · County 145, Tennessee · Built 1965 · 2 Lanes · 14,032 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
73SR0610004
Year Built
1965
Length
26.2 m (86 ft)
Max Span
8.8 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
14,032
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$108,000
Total Project Cost
$163,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.